Hiring an experienced builder to construct your dream home allows you to customize every inch of the build. Follow our guide below to build the home you’ve always dreamt of!
Average Cost To Build A Dream House
The average cost to build a house is $298,432, according to HomeAdvisor. Prices will range all the way from $154,135 to $477,534 in the U.S.
The typical price per square foot is $150, so here is a look at costs to build new homes today:
- 1,500 sq ft home: $225,000
- 1,600 sq ft home: $240,000
- 1,700 sq ft home: $255,000
- 1,800 sq ft home: $270,000
- 1,900 sq ft home: $285,000
- 2,000 sq ft home: $300,000
Stages Of Building A Dream Home
From purchase to move-in, these are the 10 most important stages associating with building a new house.
Stage 1. Planning And Permits
The first step of any new home build is developing plans with an architect and/or licensed designer. After plans have been approved, they must then be sealed by a licensed engineer. Before any builders can dig into the ground, local government must approve everything, from the design all the way to zoning and grading. Physical work on the home can only begin once the permits have been acquired.
Stage 2. Site Preparation
Typically, site preparation and foundation work is performed by the same construction crew. The crew will need to clear the land before beginning the construction process. In most cases, the land will need to be leveled ahead of time, as well. Some areas may require additional fill to bring the house to the minimum flood level.
Stage 3. Pour Foundation
Foundations are generally built on crawl spaces, slabs or basements. They will often consist of poured concrete, complete with steel rods. Concrete is not waterproof, meaning your contractor must spray it with some sort of waterproofing substance. City inspectors will then check the foundation before any building continues.
Stage 4. Framing
During this next step in this process, the contractor installs walls, windows and doors. In addition, the flooring and roofing systems will be put in place. This is the stage in the process known as the “skeleton phase.” At this point, the builder will also install a house wrap to protect your home from any outside moisture.
Stage 5. Plumbing, Electrical HVAC
Once the house wrap has been placed, it’s time to move on to the installation of the plumbing and electrical HVAC systems. After those installations, an inspector must approve wiring and pipes, among other components.
Stage 6. Add Insulation
After the home has passed the next set of inspections, insulation is the next item on the list. Insulation will help control the home’s temperature and keep it as energy efficient as possible. Common insulation types in new homes include blanket, foam and fiberglass.
Stage 7. Finish Interior
Your builder will focus on interior finishes following the additions of insulation and drywall. Interior finishes typically include internal doors, window sills, trim, fireplace and mantle. Paint will be added to the walls during this stage.
Stage 8. Finish Exterior
Things are now starting to take shape on the inside of the home. Now, your builder will take on the walkways, driveways and so on. Ensuring proper drainage away from the home is a crucial part of this step.
Stage 9. Inspection
A building code official will give final approval during the last inspection of the home. Once the certificate of occupancy is obtained, you are free to move in!
Stage 10. Final Walkthrough
This is also referred to as the pre-settlement walkthrough, where your builder will show you all you need to know about the new home. New homebuyers are advised to take an extended look at everything, since this is the last time you can ask to have anything corrected before move in.
How Long Does It Take To Build A Dream Home?
Typically, a custom home will take between 6 to 16 months from start to finish. Smaller homes may take less than 6 months to complete, with medium to larger homes taking anywhere between 10 to 16 months.
The time for a custom home differs as well because there can be factors like an existing property on a recently purchased lot that needs to be torn down and will require permits from the city or county it is located in. Also, there will be building permits and construction codes that will need to be taken into consideration not to mention home owner’s associations as well.
Rules could range from the height of new homes to the particular exterior style, but this could also require an environmental study done due to endangered wildlife or vegetation. Other environmental factors that could affect the timeline of your custom home would include mature trees on the property, weather, and possibly rough terrain.
With all of these factors stated for what could possibly happen New Home Source says to plan on two years from pre-construction activity like finding a builder and other team members and one year for the actual construction of the home. These times are varied and will depend on things like materials, labor, permits, weather, and any possible acts of God like fire or floods that could delay the project.
Build A Dream Home In Arizona
Contact Hughes Development today to get an estimate for your home building project. Hughes Development builds custom homes in Mesa, Apache Wells, Mountain Whisper and more areas in Arizona.
More Articles About Home Building
- 25 Home Ownership Quotes
- Cost To Build A House: All 50 States
- Buying A House Checklist
- Questions To Ask When Building A Home
- Is It Cheaper To Build Or Buy A House In Arizona?
- 5 Things To Consider When Building A House In Arizona
- What Is A Custom Home?
- Homeowner’s Checklist For Building A House
- Custom Home Building Process
- How Much Does It Cost To Build a House in Arizona?
- How Much Does It Cost To Build A House?